Tuesday, February 7, 2012

Ok,I was absent for some time as I've had so much going on but let's continue.
For those who have an asphalt drive already and it has begun to crack or rut out or pot holes have appeared,give a few contractors a call to come give an estimate on "overlaying your drive. If you drive has little or no structural damage a straight forward over lay is what you need. I recommend 1.5 - 2 inches  of a 9.5 mm or"f" mix.If it's rutting or cracking or has mud pumping up through the top you need some corrective work first. Anything soft or muddy,seems wet or is rutting and you can see it move when traffic rolls across it should be saw cut and removed down to solid subgrade and replaced with GAB and or 19 mm asphalt and compacted. Then leveled by zeroing the depth cranks on the paver. Bituminous asphaltic "Tack" coat should be applied(liquid asphalt,ac3). If the contractor is a reputable one they will recommend this. After the "tack coat" an anti-fracture membrane called"petro-mat" will be rolled out. This is a type of fabric that is soaked and coated with asphalt. Then the top coat or overlay. This fabric may cost a little more but it is well worth the cost. It will prevent cracking and failure in the existing asphalt from coming to the surface through the new over lay. This is one of the most important if not the most important step to take in overlaying existing asphalt. It will provide an element of re-enforcement preventing any failure to come through the new paving job,as well as a moisture barrier. Again make sure you speak with your contractor about water drainage. Pay close attention to any walk ways, carports,doorways,garages making certain you have room for additional material without damming water or throwing water back inside the house or carport.It may be necessary to saw cut and remove existing material far enough away from the set grade(doorway,steps,carport) to apply the new lift of asphalt without holding water. Be sure once the paving has been completed that any waste material is picked up and removed as the paving crew leaves. Once it loses temp it will be solid and ,depending on the amount,could be very hard for the home owner to deal with. Look the drive/parking lot over for roller marks, splits, or cracks while the contractor is cleaning up and loading equipment. If there is any problems this is the best time to correct them. Most "good"paving foremen will walk the job over taking a final look before picking up and leaving. I always unrolled the water hose and wet the job to check for proper drainage. Dont try to do this until the finish roller has completed marking out .In my next post we will look at cementitious concrete on driveways/small parking areas.

2 comments:

  1. What’s up to one and all, as I’m in reality excited of reading this blog post that is updated recurrently? It is made up out of nice stuff. GTA Paving Pro's

    ReplyDelete